HOME
• • •
OTHER INFO & FAQ's
• • •
•
Schedule & Fares
•
Getting Here
•
Special Event Trains
•
History
•
Machinery
•
Scenery
•
•
Behind The Scenes
•
Photo Galleries
•
Contact Us
•
PURCHASE TICKETS
NEWS & UP-DATES
Our 2010 season begins May 22 and runs through October 17
Cumbres Toltec Scenic Railroad Locomotive Whistles
Click On Any Description To Hear The Whistle These Are MP3 Files
Click Here To Download QuickTime For Free
Each ― indicates a Long Sound
Each • indicates a Short Sound
Apply Brakes
―
Proceed
• •
This Signal Has Two Meanings. When Stopped, Backup; When Moving, Stop At The Next Station
• • •
Call For Signals Or Engineer On Second Locomotive Assist In Charging Brake Pipe
• • • •
Approaching A Crossing
― ― • ―
Approaching A Meeting Or Waiting Point
― ― •
Engineer On Second Locomotive With Control Of Airbrakes Set Brakes And Close Doubleheading Cut Out Cock. Engineer On Lead Locomotive Take Control Of Air Brakes And Acknowledge By Repeating Signal
• ― •
Warning At Places Where View Is Obstructed Or Answer To Yellow Flag
― •
Answer To Any Other Signal Not Otherwise Provided For
• •